Hydroseeding is a proven technique for controlling erosion and promoting vegetation on disturbed or newly graded soils. In 2019, MALT Ventures undertook a municipal hydroseeding project in collaboration with C & C Road Maintenance for Port Edward, British Columbia. The objective was to stabilize exposed soil surfaces using site-appropriate materials and methods aligned with municipal environmental guidelines.


This project involved applying hydroseed to various terrain profiles within the municipality and required technical coordination to meet ecological, logistical, and performance requirements. The hydroseeding initiative exemplifies the application of targeted erosion control to infrastructure-related works in Port Edward. Call us.

PROJECT SCOPE AND CONTEXT

The hydroseeding project was developed to support municipal earthworks and protect infrastructure through soil stabilization. Work zones included roadside shoulders, sloped embankments, and other cleared areas vulnerable to wind and water erosion. MALT Ventures was responsible for the hydroseeding application, while C & C Road Maintenance managed the preliminary earthmoving and grading.

HYDROSEEDING APPLICATION PROCESS

The hydroseeding application involves a combination of seed, mulch, water, and tackifier, which is designed to provide immediate soil protection and support long-term plant growth. Specific aspects of the process included:

SITE-SPECIFIC SEED MIXTURES

  • Formulated to suit the local soil and climate conditions of Port Edward.

  • Included native and adaptable species to ensure sustainable vegetation establishment.

​WOOD FIBRE MULCH

  • Used as a base medium to retain moisture and insulate the seeds.

  • Aided in temperature regulation and improved seed-to-soil contact.

ORGANIC TACKIFIER

  • Ensured the mulch mixture adhered to sloped or loose soil surfaces.

  • Minimized displacement caused by rainfall or wind before germination.

MALT Ventures applied the hydroseeding mixture using specialized equipment that ensured even distribution across variable terrain. This approach supported uniform plant growth and immediate surface protection.

COLLABORATION AND PROJECT COORDINATION

Working closely with C & C Road Maintenance, MALT Ventures coordinated each project phase efficiently. Key actions taken during the partnership included:

SCHEDULING AND PHASING

  • Sequenced site grading and seeding in alignment with weather forecasts to maximize germination potential.

EQUIPMENT AND MATERIAL MANAGEMENT

  • Ensured timely delivery and preparation of slurry components.

  • Managed calibration of hydroseeding machinery for accurate application volumes.

ON-SITE SUPERVISION

  • Maintained consistent communication between teams.

  • Addressed environmental and logistical challenges in real time.

This cooperative model ensured that the hydroseeding project progressed according to plan without compromising environmental standards.

ENVIRONMENTAL AND FUNCTIONAL BENEFITS

The application of hydroseeding provided both immediate and long-term benefits. These included:

 

Effective Erosion Control

  • Wood fibre mulch and tackifier protected exposed soils from displacement.

  • Reduced sediment transport into drainage systems and nearby water bodies.
     

Rapid Vegetation Establishment

  • The tailored seed mix promoted fast germination and robust root systems.

  • Early plant growth supported long-term site stabilization.
     

Protection of Municipal Infrastructure

  • Stabilized surfaces helped reduce the impact of erosion on roads, curbs, and stormwater systems.

  • Minimized maintenance costs and extended the lifespan of nearby infrastructure.
     

Sustainable Land Management

  • Biodegradable components are aligned with municipal environmental objectives.

  • The use of native seed species supports ecological resilience and habitat value.
     

These outcomes reflect the technical merit and environmental responsibility of hydroseeding in Port Edward, particularly when used with experienced local contractors.

PROJECT OUTCOMES

Upon completion, the seeded areas showed rapid initial coverage, with vegetation continuing to establish over the following weeks. Site inspections confirmed that the combination of wood fibre and tackifier remained intact during weather events, effectively preventing soil erosion. The project achieved the following results:

 

  • Reduced risk of slope instability in freshly graded areas.

  • Improved visual integration of construction zones into the surrounding landscape.

  • Supported long-term vegetation goals with minimal environmental disruption.

 

The success of this municipal hydroseeding effort demonstrated how strategic erosion control methods can address multiple site objectives simultaneously.

SUSTAINABLE PRACTICES THROUGH HYDROSEEDING IN PORT EDWARD

The hydroseeding project conducted by MALT Ventures, in partnership with C & C Road Maintenance, highlights the benefits of well-coordinated land restoration in municipal settings. The project supported soil stability, infrastructure protection, and environmental compliance by applying seed mixtures tailored to Port Edward's local conditions and reinforcing them with organic mulch and tackifier. Read our blogs to know more about hydroseeding. 

The image shows a worker hydroseeding, spraying a green slurry to plant grass
mv logo

NEED PROFESSIONAL HYDROSEEDING SERVICES IN PORT EDWARD?

Our team offers reliable hydroseeding solutions tailored to your site conditions. We strive to deliver effective erosion control and land restoration.

bottom of page